42.21.Z - Works related to the construction of transmission pipelines and distribution networks
41.10.Z - Construction work related to the construction of residential and non-residential buildings
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.11.Z - Works related to the construction of roads and highways
42.91.Z - Works related to the construction of water engineering objects
43.12.Z - Site preparation for construction
43.13.Z - Performing excavations and geological-engineering drilling
43.21.Z - Installation of electrical systems
43.22.Z - Installation of plumbing, heating, and air-conditioning systems
43.99.Z - Other specialized construction works, not classified elsewhere
2021 | 2022 | 2023 | ||
---|---|---|---|---|
M PLN | M PLN | M PLN | % | |
Assets | 0,9 | 1,7 | 2,7 | 57,5 |
Gross profit (loss) | -0 | 0,8 | 0,8 | -7,2 |
Net profit (loss) | -0 | 0,8 | 0,7 | -7,5 |
Liabilities and provisions for liabilities | 0,9 | 1 | 1,3 | 30,5 |
Income tax | 0 | 0,1 | 0,1 | -4,3 |
Equity capital | -0 | 0,7 | 1,4 | 94,1 |
Working assets | 0,9 | 0,6 | 1,4 | 124,1 |
Basic operational activity income | 0,5 | 2,9 | 2,9 | -0,8 |
% | % | % | p.p. | |
Profitability of capital | 101,8 | 48,5 | -53,3 | |
Equity capital to total assets | -1,5 | 42,5 | 52,3 | 9,8 |
Gross profit margin | -8,9 | 28,3 | 26,5 | -1,8 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane