42.11.Z - Works related to the construction of roads and highways
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.12.Z - Works related to the construction of railways and underground railways
42.13.Z - Works related to the construction of bridges and tunnels
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
42.22.Z - Works related to the construction of telecommunications and electrical lines
43.11.Z - Demolition and destruction of buildings
43.12.Z - Site preparation for construction
43.13.Z - Performing excavations and geological-engineering drilling
43.91.Z - Masonry works
2021 | 2022 | 2023 | ||
---|---|---|---|---|
M PLN | M PLN | M PLN | % | |
Assets | 0 | 0 | 0 | 8,7 |
Gross profit (loss) | -0,1 | -0,1 | -0,1 | -56,8 |
Net profit (loss) | -0,1 | -0,1 | -0,1 | -56,8 |
Liabilities and provisions for liabilities | 0,9 | 0,9 | 1 | 9,8 |
Income tax | 0 | 0 | 0 | 0 |
Working assets | 0 | 0 | 0 | 213,5 |
Equity capital | -0,9 | -0,9 | -0,9 | -9,8 |
Basic operational activity income | 0,9 | 1,2 | 0,9 | -21,3 |
% | % | % | p.p. | |
Equity capital to total assets | -2083,1 | -10 914,8 | -11 026,9 | -112,1 |
Gross profit margin | -8,4 | -4,6 | -9,2 | -4,6 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane