41.10.Z - Construction work related to the construction of residential and non-residential buildings
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.11.Z - Works related to the construction of roads and highways
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
43.11.Z - Demolition and destruction of buildings
43.12.Z - Site preparation for construction
43.13.Z - Performing excavations and geological-engineering drilling
43.22.Z - Installation of plumbing, heating, and air-conditioning systems
43.29.Z - Specialized construction works
2022 | 2023 | ||
---|---|---|---|
K PLN | K PLN | % | |
Assets | 12,3 | 47,5 | 284,8 |
Gross profit (loss) | -16,5 | 29,9 | 281,3 |
Net profit (loss) | -16,5 | 24,1 | 246,3 |
Liabilities and provisions for liabilities | 18,9 | 30,4 | 60,9 |
Income tax | 0 | 5,8 | -∞ |
Working assets | 12,3 | 47,5 | 284,8 |
Equity capital | -6,6 | 17,6 | 368,6 |
Basic operational activity income | 8 | 31,9 | 298,4 |
% | % | p.p. | |
Profitability of capital | 137,2 | ||
Equity capital to total assets | -53,1 | 37,1 | 90,2 |
Gross profit margin | -206,3 | 93,9 | 300,2 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane