42.11.Z - Works related to the construction of roads and highways
41.10.Z - Construction work related to the construction of residential and non-residential buildings
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
42.91.Z - Works related to the construction of water engineering objects
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
43.11.Z - Demolition and destruction of buildings
43.12.Z - Site preparation for construction
43.21.Z - Installation of electrical systems
43.22.Z - Installation of plumbing, heating, and air-conditioning systems
2021 | 2022 | 2023 | ||
---|---|---|---|---|
M PLN | M PLN | M PLN | % | |
Assets | 0,3 | 0,4 | 0,2 | -49,4 |
Gross profit (loss) | -0 | 0 | -0,1 | -4630,5 |
Net profit (loss) | -0 | 0 | -0,1 | -4630,5 |
Liabilities and provisions for liabilities | 0 | 0,2 | 0 | -97,9 |
Income tax | 0 | 0 | 0 | 0 |
Equity capital | 0,3 | 0,3 | 0,2 | -20,2 |
Working assets | 0,3 | 0,4 | 0,2 | -49,4 |
Basic operational activity income | 0,1 | 1,1 | 0,1 | -94 |
% | % | % | p.p. | |
Profitability of capital | -1,4 | 0,4 | -25,3 | -25,7 |
Equity capital to total assets | 85,7 | 62,4 | 98,5 | 36,1 |
Gross profit margin | -2,7 | 0,1 | -81,5 | -81,6 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane