42.91.Z - Works related to the construction of water engineering objects
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.11.Z - Works related to the construction of roads and highways
42.12.Z - Works related to the construction of railways and underground railways
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
43.11.Z - Demolition and destruction of buildings
43.12.Z - Site preparation for construction
43.13.Z - Performing excavations and geological-engineering drilling
43.21.Z - Installation of electrical systems
2021 | 2022 | 2023 | ||
---|---|---|---|---|
K PLN | K PLN | K PLN | % | |
Assets | 5 | 226,2 | 477,7 | 111,2 |
Gross profit (loss) | 0 | 115,8 | 284,4 | 145,6 |
Net profit (loss) | 0 | 105,4 | 258,8 | 145,6 |
Liabilities and provisions for liabilities | 0 | 115,8 | 236,3 | 104,1 |
Income tax | 0 | 10,4 | 25,6 | 145,6 |
Working assets | 5 | 226,2 | 477,7 | 111,2 |
Equity capital | 5 | 110,4 | 241,3 | 118,7 |
Basic operational activity income | 0 | 167,5 | 433,8 | 159,1 |
% | % | % | p.p. | |
Profitability of capital | 0 | 95,5 | 107,2 | 11,7 |
Equity capital to total assets | 100 | 48,8 | 50,5 | 1,7 |
Gross profit margin | 69,2 | 65,6 | -3,6 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane