42.12.Z - Works related to the construction of railways and underground railways
25.11.Z - Production of metal constructions and their parts
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.11.Z - Works related to the construction of roads and highways
42.13.Z - Works related to the construction of bridges and tunnels
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
43.11.Z - Demolition and destruction of buildings
43.12.Z - Site preparation for construction
43.99.Z - Other specialized construction works, not classified elsewhere
49.41.Z - Road freight transport
2021 | 2022 | 2023 | ||
---|---|---|---|---|
M PLN | M PLN | M PLN | % | |
Assets | 0,3 | 0 | 1,4 | 40 154,1 |
Gross profit (loss) | -0,1 | -0 | 0,1 | 681,6 |
Net profit (loss) | -0,1 | -0 | 0,1 | 671,6 |
Liabilities and provisions for liabilities | 0,3 | 0 | 1,3 | 7286 |
Income tax | 0 | 0 | 0 | -∞ |
Working assets | 0,3 | 0 | 1,4 | 40 154,1 |
Equity capital | 0 | -0 | 0,1 | 812,3 |
Basic operational activity income | 1,8 | 0 | 1,6 | -∞ |
% | % | % | p.p. | |
Profitability of capital | -1144,7 | 114 | 1258,7 | |
Equity capital to total assets | 1,9 | -405,9 | 7,2 | 413,1 |
Gross profit margin | -3,8 | 7,3 | 11,1 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane