43.22.Z - Installation of plumbing, heating, and air-conditioning systems
33.12.Z - Repair and maintenance of machinery
42.11.Z - Works related to the construction of roads and highways
42.13.Z - Works related to the construction of bridges and tunnels
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
42.91.Z - Works related to the construction of water engineering objects
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
43.29.Z - Specialized construction works
43.99.Z - Other specialized construction works, not classified elsewhere
74.90.Z - Other professional, scientific and technical activities, not elsewhere classified
2021 | 2022 | 2023 | ||
---|---|---|---|---|
M PLN | M PLN | M PLN | % | |
Assets | 0,5 | 0,6 | 0,6 | 2,5 |
Gross profit (loss) | 0 | 0,1 | 0 | -84,2 |
Net profit (loss) | 0 | 0,1 | 0 | -84 |
Liabilities and provisions for liabilities | 0,1 | 0,1 | 0,1 | 4,7 |
Income tax | 0 | 0 | 0 | -85,5 |
Working assets | 0,4 | 0,5 | 0,5 | 5 |
Equity capital | 0,4 | 0,5 | 0,5 | 2 |
Basic operational activity income | 0,9 | 1,3 | 1 | -21,2 |
% | % | % | p.p. | |
Profitability of capital | 4,4 | 12,5 | 2 | -10,5 |
Equity capital to total assets | 78 | 83,1 | 82,7 | -0,4 |
Gross profit margin | 2,2 | 5 | 1 | -4 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane