42.13.Z - Works related to the construction of bridges and tunnels
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.11.Z - Works related to the construction of roads and highways
42.91.Z - Works related to the construction of water engineering objects
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
43.11.Z - Demolition and destruction of buildings
43.12.Z - Site preparation for construction
43.21.Z - Installation of electrical systems
43.22.Z - Installation of plumbing, heating, and air-conditioning systems
43.39.Z - Specialized construction works
2021 | 2022 | 2023 | ||
---|---|---|---|---|
K PLN | K PLN | K PLN | % | |
Assets | 65 | 60,5 | 56,3 | -7 |
Gross profit (loss) | -4,6 | -4,1 | -4,2 | -2 |
Net profit (loss) | -4,6 | -4,1 | -4,2 | -2 |
Liabilities and provisions for liabilities | 0,3 | 0 | 0 | 0 |
Income tax | 0 | 0 | 0 | 0 |
Working assets | 65 | 60,5 | 56,3 | -7 |
Equity capital | 64,7 | 60,5 | 56,3 | -7 |
Basic operational activity income | 0 | 0 | 0 | 0 |
% | % | % | p.p. | |
Profitability of capital | -7 | -6,8 | -7,5 | -0,7 |
Equity capital to total assets | 99,5 | 100 | 100 | 0 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane