42.11.Z - Works related to the construction of roads and highways
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
42.22.Z - Works related to the construction of telecommunications and electrical lines
42.91.Z - Works related to the construction of water engineering objects
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
43.11.Z - Demolition and destruction of buildings
43.12.Z - Site preparation for construction
43.13.Z - Performing excavations and geological-engineering drilling
43.21.Z - Installation of electrical systems
43.22.Z - Installation of plumbing, heating, and air-conditioning systems
2021 | 2022 | 2023 | ||
---|---|---|---|---|
K PLN | K PLN | K PLN | % | |
Assets | 152,6 | 151,3 | 150,3 | -0,7 |
Equity capital | 151,2 | 150 | 148,9 | -0,7 |
Working assets | 152,6 | 151,3 | 150,3 | -0,7 |
Net profit (loss) | -0,4 | -1,2 | -1,1 | 12,7 |
Liabilities and provisions for liabilities | 1,4 | 1,4 | 1,4 | 0 |
% | % | % | p.p. | |
Profitability of capital | -0,2 | -0,8 | -0,7 | 0,1 |
Equity capital to total assets | 99,1 | 99,1 | 99,1 | 0 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane