43.12.Z - Site preparation for construction
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
42.91.Z - Works related to the construction of water engineering objects
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
43.11.Z - Demolition and destruction of buildings
43.13.Z - Performing excavations and geological-engineering drilling
43.21.Z - Installation of electrical systems
43.22.Z - Installation of plumbing, heating, and air-conditioning systems
43.29.Z - Specialized construction works
49.41.Z - Road freight transport
| 2022 | 2023 | ||
|---|---|---|---|
K PLN | K PLN | % | |
Aktywa | 95,8 | 113,1 | 18,1 |
Aktywa obrotowe | 91,8 | 109,1 | 18,9 |
Środki pieniężne | 1 | 1 | 0 |
Kapitał (fundusz) własny | 95,8 | 113,1 | 18,1 |
Zysk (strata) brutto | 38,3 | 17,3 | -54,7 |
Zysk (strata) netto | 38,3 | 17,3 | -54,7 |
Zysk operacyjny (EBIT) | 38,3 | 17,3 | -54,7 |
Przychody netto ze sprzedaży | 49,2 | 20 | -59,4 |
% | % | p.p. | |
Kapitał własny do aktywów ogółem | 100 | 100 | 0 |
Rentowność kapitału (ROE) | 40 | 15,3 | -24,7 |
Wskaźnik Rentowności sprzedaży (ROS) | 77,8 | 86,8 | 9 |
Marża zysku brutto | 77,8 | 86,8 | 9 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane