70.22.Z - Head office activities and management consultancy
41.10.Z - Construction work related to the construction of residential and non-residential buildings
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.11.Z - Works related to the construction of roads and highways
42.12.Z - Works related to the construction of railways and underground railways
42.13.Z - Works related to the construction of bridges and tunnels
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
42.22.Z - Works related to the construction of telecommunications and electrical lines
42.91.Z - Works related to the construction of water engineering objects
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
2021 | 2022 | ||
---|---|---|---|
K PLN | K PLN | % | |
Assets | 15 | 4,7 | -68,5 |
Gross profit (loss) | 0 | 0 | 0 |
Net profit (loss) | 0 | 0 | 0 |
Liabilities and provisions for liabilities | 183 | 172,7 | -5,6 |
Income tax | 0 | 0 | 0 |
Equity capital | -168 | -168 | 0 |
Working assets | 15 | 4,7 | -68,5 |
Basic operational activity income | 0 | 0 | 0 |
% | % | p.p. | |
Equity capital to total assets | -1119,8 | -3557,1 | -2437,3 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane