41.10.Z - Construction work related to the construction of residential and non-residential buildings
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.11.Z - Works related to the construction of roads and highways
42.13.Z - Works related to the construction of bridges and tunnels
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
43.11.Z - Demolition and destruction of buildings
43.12.Z - Site preparation for construction
43.13.Z - Performing excavations and geological-engineering drilling
43.21.Z - Installation of electrical systems
43.22.Z - Installation of plumbing, heating, and air-conditioning systems
2021 | 2022 | 2023 | ||
---|---|---|---|---|
K PLN | K PLN | K PLN | % | |
Assets | 200 | 800 | 800 | 0 |
Profit (loss) on sale | 0 | 0 | 0 | 0 |
Gross profit (loss) | 0 | 0 | 0 | 0 |
Net profit (loss) | 0 | 0 | 0 | 0 |
Cash | 200 | 800 | 800 | 0 |
Liabilities and provisions for liabilities | 0 | 0 | 0 | 0 |
Net income from sale | 0 | 0 | 0 | 0 |
Short time liabilities | 0 | 0 | 0 | 0 |
Other operating costs | 0 | 0 | 0 | 0 |
Working assets | 200 | 800 | 800 | 0 |
Equity capital | 200 | 800 | 800 | 0 |
Other income costs | 0 | 0 | 0 | 0 |
Operating profit (EBIT) | 0 | 0 | 0 | 0 |
% | % | % | p.p. | |
Profitability of capital | 0 | 0 | 0 | 0 |
Equity capital to total assets | 100 | 100 | 100 | 0 |
Days | Days | Days | Days | |
Short term commitment turnover cycle | 0 | 0 | 0 | 0 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane