43.22.Z - Installation of plumbing, heating, and air-conditioning systems
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.11.Z - Works related to the construction of roads and highways
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
43.11.Z - Demolition and destruction of buildings
43.12.Z - Site preparation for construction
43.13.Z - Performing excavations and geological-engineering drilling
43.29.Z - Specialized construction works
43.31.Z - Plastering
2022 | 2023 | 2024 | ||
---|---|---|---|---|
M PLN | M PLN | M PLN | % | |
Assets | 1,4 | 1,3 | 1,4 | 13,1 |
Gross profit (loss) | -0,2 | -0,2 | 0 | 116,8 |
Net profit (loss) | -0,2 | -0,2 | 0 | 111 |
Liabilities and provisions for liabilities | 0,7 | 0,8 | 0,9 | 17,2 |
Income tax | 0 | 0 | 0 | -∞ |
Working assets | 1 | 1,1 | 1,4 | 26,8 |
Equity capital | 0,7 | 0,5 | 0,5 | 5,8 |
Basic operational activity income | 2,7 | 2 | 2,3 | 19,2 |
% | % | % | p.p. | |
Profitability of capital | -25,7 | -52,7 | 5,5 | 58,2 |
Equity capital to total assets | 50,5 | 36 | 33,7 | -2,3 |
Gross profit margin | -6,2 | -12,2 | 1,7 | 13,9 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane