35.11.Z - Generation of electricity from non-renewable sources
35.21.Z - Generation of gas fuels
35.22.Z - Distribution of gas fuels in a network system
35.23.Z - Trading of gas fuels in a network system
35.30.Z - Generation and supply of steam and air for air-conditioning systems
38.21.Z - Material recovery
38.31.Z - Waste incineration without energy recovery
38.32.Z - Waste disposal in landfills
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
2022 | 2023 | ||
---|---|---|---|
K PLN | K PLN | % | |
Assets | 3,2 | 5,5 | 70,2 |
Gross profit (loss) | -1,8 | -14 | -681 |
Net profit (loss) | -1,8 | -14 | -681 |
Liabilities and provisions for liabilities | 0 | 16,2 | -∞ |
Income tax | 0 | 0 | 0 |
Working assets | 3,2 | 5,5 | 70,2 |
Equity capital | 3,2 | -10,8 | -436,3 |
Basic operational activity income | 0 | 0 | 0 |
% | % | p.p. | |
Profitability of capital | -55,9 | ||
Equity capital to total assets | 100 | -197,6 | -297,6 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane