41.10.Z - Construction work related to the construction of residential and non-residential buildings
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.11.Z - Works related to the construction of roads and highways
42.12.Z - Works related to the construction of railways and underground railways
42.13.Z - Works related to the construction of bridges and tunnels
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
42.22.Z - Works related to the construction of telecommunications and electrical lines
42.91.Z - Works related to the construction of water engineering objects
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
43.11.Z - Demolition and destruction of buildings
2022 | 2023 | 2024 | ||
---|---|---|---|---|
M PLN | M PLN | M PLN | % | |
Assets | 0,3 | 0,2 | 0,2 | -17,8 |
Gross profit (loss) | -0 | 0 | 0,1 | 350,2 |
Net profit (loss) | -0 | 0 | 0,1 | 287,8 |
Liabilities and provisions for liabilities | 0,2 | 0,1 | 0,1 | -12 |
Income tax | 0 | 0 | 0 | 1326,3 |
Working assets | 0,3 | 0,2 | 0,2 | -17,8 |
Equity capital | 0,1 | 0,1 | 0,1 | -24 |
Basic operational activity income | 1,4 | 0,7 | 1,6 | 115,5 |
% | % | % | p.p. | |
Profitability of capital | -16,5 | 17,3 | 88,5 | 71,2 |
Equity capital to total assets | 35,1 | 48,5 | 44,9 | -3,6 |
Gross profit margin | -1,1 | 2,9 | 6 | 3,1 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane