41.10.Z - Construction work related to the construction of residential and non-residential buildings
41.20.Z - Construction work related to the construction of residential and non-residential buildings
42.11.Z - Works related to the construction of roads and highways
42.21.Z - Works related to the construction of transmission pipelines and distribution networks
42.22.Z - Works related to the construction of telecommunications and electrical lines
42.91.Z - Works related to the construction of water engineering objects
42.99.Z - Works related to the construction of other civil engineering and water engineering objects, not classified elsewhere
43.11.Z - Demolition and destruction of buildings
43.12.Z - Site preparation for construction
43.13.Z - Performing excavations and geological-engineering drilling
2021 | 2022 | 2023 | ||
---|---|---|---|---|
K PLN | K PLN | K PLN | % | |
Assets | 279,2 | 321,1 | 362,6 | 12,9 |
Gross profit (loss) | 27,2 | 68 | 56,2 | -17,4 |
Net profit (loss) | 27,2 | 68 | 44 | -35,3 |
Liabilities and provisions for liabilities | 28,7 | 2,6 | 0 | -100 |
Income tax | 0 | 0 | 12,2 | -∞ |
Working assets | 260,3 | 20,6 | 62,1 | 200,9 |
Equity capital | 250,5 | 318,6 | 362,6 | 13,8 |
Basic operational activity income | 180 | 140 | 0 | -100 |
% | % | % | p.p. | |
Profitability of capital | 10,9 | 21,4 | 12,1 | -9,3 |
Equity capital to total assets | 89,7 | 99,2 | 100 | 0,8 |
Gross profit margin | 15,1 | 48,6 | 33,5 |
Opinie dotyczące usług, produktów oraz działalności firmy nie są weryfikowane